Everything That Goes Into Data Center Construction
Data center construction is a highly specialized sector that’s growing rapidly, driven by the increasing demand for cloud services, big data, high-performance computing, and emerging technologies like AI and machine learning. As businesses continue to generate massive amounts of data, the need for efficient and scalable data centers is more urgent than ever.
To keep up with this growth, understanding how data centers are constructed and, more specifically, how building materials are delivered to these sites is crucial.
What Is a Data Center?
A data center is a facility used to house computer systems, servers, and related components, such as storage devices and networking equipment. These centers are designed to support the processing, storage, and management of vast amounts of data, powering industries ranging from cloud computing to artificial intelligence.
As companies rely more on cloud-based services, the need for data centers is accelerating. This rising demand is placing pressure on the industry to build more data centers faster
What Is a Data Center Construction?
Unlike traditional construction, which often uses standard building materials like wood and brick, data center construction requires specialized materials and systems. These facilities are designed to support massive computing power, continuous operations, and energy-efficient solutions. The construction must accommodate not only high-performance IT equipment but also sophisticated cooling, power distribution, and security systems.
Key Components of Data Center Construction
1. Site Selection
Choosing the right location is one of the most important steps in constructing a data center. Factors to consider include:
- Proximity to power sources and fiber optic networks
- Local zoning laws and regulations
- Accessibility to key transportation routes
- The region’s susceptibility to natural disasters (earthquakes, floods, etc.)
Special Consideration: Choosing areas with access to renewable energy sources is becoming increasingly important for sustainability goals in construction.
2. Building Design
The design must accommodate specific needs, including:
- Cooling: Data centers require cooling solutions to manage heat from servers and IT equipment.
- Power Distribution: A reliable power distribution system is essential to keep operations running smoothly.
- Security: Physical and cybersecurity measures must be designed into the building to prevent unauthorized access and ensure the safety of sensitive data.
3. Power Distribution & Backup Systems
Data centers must have an uninterrupted power supply (UPS) to ensure continuous service, and backup generators are necessary to mitigate power outages. Redundancy is a key factor in designing these systems to ensure that the data center can continue operations even in emergencies.
4. Cooling and Environmental Control
Cooling systems, such as air conditioning, liquid cooling, and advanced environmental control technologies, ensure that data center equipment remains within optimal temperature ranges. Given the amount of heat generated, these systems are as important as the equipment themselves.
5. High-Performance Servers and Storage
The heart of any data center is its servers and storage devices. Servers perform data processing, while storage systems hold vast quantities of data. Advances in server architecture and storage technology continue to drive the evolution of data center designs.
6. Security Systems
With sensitive data housed in data centers, security is paramount. From biometric access controls to surveillance systems, the security infrastructure must include both physical and cyber defense measures to protect against threats.
Simplify Material Transport for Your Data Center Build
Mercer Transportation handles scheduling, routing, and safe delivery so you can focus on building high-performance data centers.
Transportation and Logistics for Data Center Construction
The logistics of transporting materials to a data center construction site are incredibly complex. The construction materials are often oversized, heavy, and sometimes fragile, requiring specialized transportation methods.
Types of Construction Materials That Need Special Transport
Building a data center involves transporting materials such as:
- Steel framing and structural elements
- Electrical components (e.g., power distribution systems)
- Cooling equipment (air conditioning units, chillers)
- Fiber optic cables
- Heavy-duty generators for backup power
- Servers and storage equipment
These materials require the use of specialized trucks, including flatbeds, drop-deck trailers, and climate-controlled trucks for sensitive equipment.
Common Construction Materials for Data Centers (with Transport Considerations)
| Material | Use in Construction | Transportation Consideration |
|---|---|---|
| Steel | Structural support, framing | Flatbeds, long-distance shipping |
| Concrete | Foundation, floors | Specialized trucks, oversized loads |
| HVAC Units | Cooling systems | Drop decks, sensitive handling |
| Power Distribution | Electrical setup | Dry vans, temperature control |
Specialized Materials for Energy Efficiency
As energy consumption is a significant concern for data center design, energy-efficient materials and systems are a priority. Renewable energy systems, including solar panels and battery storage, are becoming increasingly common in new projects.

Given the size and weight of the materials used, transporting them to a construction site requires specific planning and coordination. Managing the safe delivery of these materials while adhering to strict schedules is a top priority in data center construction. Freight carriers must work closely with contractors and project managers to ensure that the materials arrive on time and in proper condition.
Here are some logistical considerations when transporting materials to a data center construction site:
- Size and Weight: Many construction materials, such as large servers or heavy cooling units, require special equipment like flatbeds or heavy-haul trucks.
- Fragility of Equipment: Servers, storage devices, and cooling systems can be sensitive to damage. Proper packaging and securement are essential.
- Coordination with Construction Schedule: Material delivery must be carefully timed with the progress of construction. Delays in transportation can delay the entire project.
- Regulatory Compliance: Data centers often need to comply with local regulations regarding construction, materials, and environmental impact. Ensuring that materials are transported in compliance with these regulations is critical.
Mercer Transportation works closely with contractors to ensure that all logistics are managed efficiently, providing a tailored solution for each stage of the delivery process.
Timely Material Delivery and Project Coordination
The timely delivery of materials is critical to keeping data center construction on schedule. A single delay in delivery can cause a cascade effect, delaying the entire project timeline. Proper coordination between contractors, project managers, and freight carriers is essential to meeting deadlines and minimizing costly delays.
A typical construction timeline for a data center might look like this:
- Months 1-3: Site preparation, including concrete and steel framing deliveries.
- Months 4-6: Structural steel and roofing materials are delivered via flatbed trucks.
- Months 7-9: MEP systems (Mechanical, Electrical, Plumbing) installation and heavy-duty equipment transportation.
- Months 10-12: IT equipment installation and climate-controlled transport for servers.
Common Challenges in Data Center Construction and Transportation
1. Access Road Limitations
Many construction sites are in industrial zones with restricted access, making transportation of oversized equipment challenging. To mitigate this, route surveys must be conducted before delivery to ensure safe passage for large trucks.
2. Delivery Window Coordination
Construction sites often have limited space for material storage, so coordinating exact delivery windows is vital. Accurate timing ensures that construction teams can unload materials without blocking access to other critical areas.
3. Weather Delays
Inclement weather, such as heavy rain, can damage sensitive materials like electrical components. Additionally, high winds can affect crane operations, which are often required for lifting heavy materials.
4. Supply Chain Disruptions
Global supply chain disruptions have become more common, affecting the delivery of critical materials. By maintaining strong supplier relationships and diversifying sources, delays can be minimized.
5. Site Readiness Delays
Construction delays at the site, such as incomplete foundation work or unfinished utility installations, can result in delayed delivery and installation of equipment.
Future Trends in Data Center Construction
As demand for data processing and storage continues to increase, future data center projects will focus on:
- Energy-efficient technologies like liquid cooling and renewable energy sources.
- Green building standards to minimize environmental impact.
- Automation in data center management and construction.
Building the Future of Data Centers with Reliable Transportation
Building a data center requires an intricate balance of construction, logistics, and planning. Timely and coordinated delivery of materials is essential for the success of these projects.
Mercer Transportation is proud to support this growing industry with reliable, specialized freight services, ensuring that data center construction projects stay on schedule and meet the needs of modern data processing.
Safe, Specialized Shipping for Every Construction Material
Mercer’s specialized trailers and equipment, combined with our trained drivers, ensure all materials, from steel beams to HVAC units, arrive intact and ready for installation.